In our opinion public spaces have to be not only comfortable, but also beautiful. The team of «Adisord» design studio successfully solves these problems in design sphere. In this case you will be offered carefully balanced decisions, couched in the form of reference sketches and precise calculations. The public interiors, distinguished by high practicality and visual appeal are created as a result.

Schematic Design

  • Preparation and approval of technical design specification
  • Creation of photo collations (collages) for determination of general stylistic direction
  • Photofixation
  • Plan of measuring
  • Dismantling plan of existing partition-walls and constructions
  • Erecting plan
  • Development of space-plan solution
  • Arrangement plan of furniture with their overall dimensions (2 options)

Detail project

  • Explanatory note

 

Space – Planning decisions

  • Plan of measurements before reconstruction
  • Plan measurements after reconstruction
  • Dismantling plan and construction of partitions
  • Space – Planning decision
  • Arrangement plan of furniture with their overall dimensions
  • Arrangement plan of plumbing equipment
  • Process design
  • Floor plan with specification of used materials – photo-collection
  • Plan of heated floors
  • Ceiling plan; section of ceiling in unique sections (levels)
  • Plan of door pull
  • Door schedule
  • Redecoration plan of walls
  • Wall elevation according to necessary (unique) sections

 

Lighting

  • Lighting plan — location of devices
  • Lighting plan — point of connection
  • Layout design of rosettes
  • Development drawings according to necessary sections
  • Wall elevation according to necessary (unique) sections

 

Applications

  • Table of floor spaces, ceilings and walls
  • Table of finishing materials
  • Specification of plumbing equipment

Term of implementation of the outline design project

The term of realization varies from 14 to 21 working days. In the process of outline stage, the individual layout and approximate space- planning solution of future project is formed in drawings.

Term of implementation of detail project

The term of realization varies from 1 to 2 months.